IKEA WAREHOUSES

  • Target:

    LIFTING AND RE-LEVELING OF THE ROAD SURFACE WHILE MAINTAINING THE SLOPE AFTER SUBSIDENCE

  • Location:

    Minsk

  • Technology:

    Slab Lifting & Void Filling

  • Year:

    2017

Nonresidential premises of “TYTUL” Business Center LTD. One-storey annex (entrance group) to the building at 5, Stepana Bandery Ave, Kyiv.

REASON FOR TREATMENT

Cracks where the entrance group adjoins the building. Vertical and inclined cracks in the bearing walls.

PROBLEM

Unconsolidated soil of the entrance group foundations. Additional soil soaking due to leaking water-bearing utilities.

PURPOSE

Soil stabilization of the strip foundations base.

WORK PERFORMED

Soil stabilization of the strip foundations base using the deep injection method of the GeoResin technology.

APPLIED METHODS

Deep Stabilization.

SCOPE OF WORK

The total length of the work area is 17.3 line meters.

    ORDER PROJECT SELECTION AND CONSULTATION

    If you have not found an object or a situation similar to yours in the portfolio on the website, then order the selection of a project that meets your requirements with a detailed description or with the advice of a geotechnical engineer.