CONFIDENCE INSTEAD OF HOPE AND EXPECTATION

Achievements in lifting and leveling building structures have created cost-effective and less invasive alternatives to traditional reinforcement and restoration methods. For builders and managers, GeoResin resins can be used as a solution for improving the properties of foundation soils, for lifting and leveling floor constructions, walls, foundations of existing buildings.

GeoResin resin injections are like precision surgery – they are applied locally and effectively. The modern two-in-one solution, by filling voids and minimizing the ability of the soil to deform, provides both an improvement in the base condition and the leveling of the building and its parts (floor and walls).

GeoResin resin is injected under load without dismantling structures using a fast, accurate and controlled method. GeoResin can be used to lift and level strip foundations, floor slabs, supporting structures, as well as driveways and platforms.

WHAT DOES THE PROBLEM WITH FOUNDATION LOOK LIKE?

Problems can arise when construction work is carried out without a design and careful construction conditions study. Defects, such as cracks in walls and floors and sinking foundations, are signs of serious constructive problems that may arise or worsen if the soil bearing capacity is not restored to the required level.

video

If you have reached this section, you care about the future of your property. By getting help from qualified professionals in good time, you will save a lot of time and money.

The first step in preserving a building that is prone to collapse is to have the building surveyed by professionals. This will help you avoid making rash or poorly-planned decisions as to what to do in order to stop the process.

GeoResin specialists will come on site and determine the type of foundation deformation and find out the reasons for it. Depending on the data they will make the necessary calculations and determine what actions to take to halt the building destruction and what is the best method of foundation stabilization.

Based on the received information, you can make a balanced decision on which of the three directions to take:

  • 01 Continue to monitor the dynamics of destruction with the help of professional instruments, defining yourself a «point of no return».
  • 02 Develop a draft solution, taking into account structural, financial and «life» constraints, and implement it.
  • 03 Apply for an alternative solution on the basis of the survey to a third party.

DEFORMATIONS OF FLATWORKS CAN BE CAUSED BY THE FOLLOWING REASONS:

  • Not properly rammed base
  • Additional new load on structures
  • Technogenic breakdowns and accidents of engineering communications
  • Structural differences in foundations within the same building
  • Regular exposure to vibrations
  • Nonhomogeneous foundation within the same building

QUESTIONS THAT GEORESIN WILL ANSWER:

  • WHAT IS GOING ON WITH THE HOUSE OR STRUCTURE IN GENERAL?
  • WHAT CAUSED THE CRACKS OR DEFORMATIONS IN THE STRUCTURE?
  • IS THERE ANY POINT IN WAITING FOR IMPROVEMENTS OR CHANGES AND WHAT KIND OF CHANGES?
  • CAN WE GET BY WITH FACE-LIFT?
  • WHAT WILL HAPPEN IF NOTHING IS DONE?
  • WILL «STORE-BOUGHT» OR «DO-IT-YOURSELF» SOLUTIONS HELP?
  • CAN A «FAMILIAR FOREMAN» SOLVE THE PROBLEM?
  • IS IT POSSIBLE, AND HOW, TO SLOW DOWN OR STOP THE PROCESS OF DESTRUCTION?
  • IS IT POSSIBLE TO GET EVERYTHING BACK AS BEFORE? WHAT ARE THE OPTIONS?
  • WHEN IS IT BETTER AND CHEAPER TO START SOLVING THE PROBLEM? IS IT POSSIBLE NOT TO RESOLVE IT RIGHT AWAY?
  • HOW MUCH DOES IT COST TO SOLVE THE PROBLEM AND WHAT ARE THE CONDITIONS FOR IMPLEMENTATION?
  • WHAT CAN BE DONE FOR X HRYVNIAS?

WE GUARANTEE:

1

ALMOST INSTANT RESULT

2

SELECTION AND DETERMINATION OF A SUITABLE SOLUTION TOGETHER WITH THE CUSTOMER

3

ONLY TOP EQUIPMENT AND TOOLS

4

POSSIBILITY OF STEP-BY-STEP IMPLEMENTATION OF THE PROJECT IN ACCORDANCE WITH THE CLIENT'S SCHEDULE

5

POST-PROJECT MONITORING AND EFFICIENCY IN CASE OF ADDITIONAL WORKS ARE NEEDED. CONTACTABLE 24/7

6

PARALLEL IMPROVEMENT OF WATERPROOFING, THERMAL AND VIBRATION INSULATION OF STRUCTURES

in any situation, it is important to consciously assess the risks of decision or inaction with an expert in the field of construction

25%

savings in comparison with traditional technologies

2-3days

for a standard project

5years

minimum warranty on the work performed

18seconds

curing time of the material

0,5mm

accuracy of work

EXAMPLES OF COMPLETED PROJECTS

    DO YOU STILL HAVE QUESTIONS?

    Our experts will be happy to consult you. Please fill out this short form so we can contact you.